← 💰 Financial Support
This page is an AI summary of official information. Please check the official page before proceeding.
💰 Financial Support Open

Solar Power Generation Incentive for Businesses

20,000 yen per 1 kilowatt of power generation output (Maximum 2,000,000 yen)
💡 The Bottom Line
Incentives are paid to businesses that have installed solar power generation systems at their offices in the city. Gunma Prefecture's subsidy grant decision is a prerequisite.
🗓 5W1H Overview
👤 Who
Small and medium-sized enterprises that have received a grant decision from Gunma Prefecture and installed a solar power generation system at their business office in the city
📋 What
Incentive for businesses introducing a solar power generation system (20,000 yen per 1kW of power output, up to a maximum of 2,000,000 yen)
⏰ When
[1st round (after prefectural grant decision)] July 7, 2025 to February 27, 2026, [2nd round (after prefectural confirmation)] until March 19, 2026
📍 Where
Applications accepted via the electronic application system (LoGo Form)
❗ Why
To promote the introduction of renewable energy to reduce greenhouse gas emissions towards achieving carbon neutrality
📝 How
Check the guidelines and apply through the electronic application system, attaching a copy of the prefecture's notification, etc.
📖 Easy Explanation

Purpose of the System

This is a system where the city pays an incentive to businesses in the city that have installed a solar power generation system at their offices. It supports the realization of carbon neutrality and the spread of renewable energy.

Eligible Persons

Businesses that have received a grant decision for Gunma Prefecture's 'Solar Power Generation Equipment, etc. Installation Support Project Subsidy' and have installed a solar power generation system at their office in the city.

  • Those with tax arrears are not eligible.

Eligible Equipment

Solar power generation systems installed after receiving the Gunma Prefecture subsidy grant decision.

  • Limited to those that are not subject to the FIT/FIP systems.

Notes

  • Applications are accepted on a first-come, first-served basis, and will close even within the application period if the budget limit is reached.
✅ Checklist
  • Required for various procedures. Check the manual for details
    Required
  • Prescribed form (Word file)
    Required
  • Prescribed form (Word file)
    Required
👥 Who Qualifies
  • Businesses in the city that have received Gunma Prefecture's subsidy grant decision (excluding those with tax arrears)
❓ Terms & FAQ
Solar Power Generation System
Equipment that converts solar light energy into electricity. By generating electricity with solar panels installed on roofs or premises, businesses and factories can supply their own power.
Incentive
Money paid for a certain achievement or action. To promote the installation of renewable energy and reduce greenhouse gas emissions, the city provides money to businesses that have installed eligible systems.
Carbon Neutrality
An initiative to balance the amount of greenhouse gas emissions and absorption, making the net emissions zero. Ota City aims to achieve this by 2050.
FIT System
A system where the government guarantees that power companies will purchase electricity generated from renewable energy sources at a fixed price for a fixed period. Systems subject to this are not eligible for this incentive.
📎 Related Procedures
🗺 Find Nearby Facilities

※AI summary. Please verify with the official page.

View Official Page ↗