💰 Financial Support Open
Solar Power Generation Incentive for Businesses
Part of the installation cost (with a maximum limit)
💡 The Bottom Line
The city subsidizes part of the cost for businesses installing solar power generation systems at their offices. Application before construction is required.
🗓 5W1H Overview
👤 Who
Small and medium-sized enterprises that have received a grant decision from Gunma Prefecture and installed a solar power generation system at their business office in the city
📋 What
Incentive for businesses introducing a solar power generation system (20,000 yen per 1kW of power output, up to a maximum of 2,000,000 yen)
⏰ When
[1st round (after prefectural grant decision)] July 7, 2025 to February 27, 2026, [2nd round (after prefectural confirmation)] until March 19, 2026
📍 Where
Applications accepted via the electronic application system (LoGo Form)
❗ Why
To promote the introduction of renewable energy to reduce greenhouse gas emissions towards achieving carbon neutrality
📝 How
Check the guidelines and apply through the electronic application system, attaching a copy of the prefecture's notification, etc.
⏱ About 1 week to prepare application documents, about 30 minutes for procedures at the counter
📖 Easy Explanation
Purpose of the System
When businesses in the city introduce a solar power generation system to their offices or factories, the city provides an incentive to cover part of the cost. This system supports the spread of renewable energy.
Eligible Persons
Corporations or sole proprietors with a business office in Ota City.
Eligible Equipment
Newly installed solar power generation systems (those meeting certain power output standards).
- Note: You must apply "before construction begins".
✅ Checklist
- RequiredObtain from the Ota City Environmental Policy Division or the website
- RequiredReceiving a subsidy grant decision from Gunma Prefecture is a requirement
- RequiredIssued by the installation contractor
- RequiredDocument confirming the power generation capacity, manufacturer, and model number
- RequiredObtain from the Ota City Taxation Division. Issued within the last 3 months
👥 Who Qualifies
- Businesses in the city (corporations and sole proprietors)
❓ FAQ
Can individuals apply for this subsidy?
As the system name states "for businesses," it is primarily for businesses (corporations and sole proprietors). For residential solar power generation, please check the separate system for households. Since eligibility requirements change depending on the fiscal year, we strongly recommend consulting with City Hall in advance.
When will the incentive be paid?
It will be paid after confirming the power generation record. Since it is calculated based on the actual power generation and sales record rather than at the time of application, it takes a certain amount of time from application to receipt.
What documents are required for the application?
Mainly, you need (1) proof of installation of solar power generation equipment (grid connection approval document, etc.), (2) records of the amount of power generated and sold, and (3) application documents. Please check with City Hall or the Ota City website for the latest details.
Can I use it together with the housing renovation subsidy?
The installation of solar power generation may be treated as part of a housing renovation. However, double subsidies for the same construction are often not allowed, so be sure to check with City Hall in advance.
📎 Related Procedures